Site
Installation to include:
 1.
Assistance in programming to determine an optimum installation
period.
2. Liaise with
the architect, direct or through the main contractor, on specification
of both materials and fixing details.
3. Offloading,
installation and temporary protection. It is
clearly advantageous to install the fittings as late as possible to
minimise the risk of physical damage and also ensure that there is a
suitable ambient temperature for the units which, like any joinery,
can suffer from exposure to low temperatures and high humidity.
|
 |